IDOT - District #8 Equipment Storage Building Work [CDB #630-000-266]

Hecker: 1200 SF addition to the pre-engineered wood building. Includes thermal, heating & electrical upgrades. East St. Louis: New 8,000 SF pre-engineered metal building. Includes plumbing, heating, & electrical work. Fairview: Remodeling to provide accessibility, energy and electrical upgrades.
00 9100 ADDENDA (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
00 91 01 Addendum No. 1 1.5 MB
00 91 02 Addendum No. 2._2020_Rev2 1.2 MB