2024 Storm Drainage Improvements Project [CP#2024-30]

The work includes the installation of approximately 1,330 foot of 15-Inch RCP storm sewer, 95 foot of 12-Inch RCP storm Sewer, and drainage structures along E. Chestnut Ave, S. 34th St. & E. Leafdale Ave. The restoration includes the replacement of approximately 260 foot of CMP culverts, patching of driveways and roads, restoration of ditches, and seeding and mulching.