2024 Storm Drainage Improvements Project [CP#2024-30]
The work includes the installation of approximately 1,330 foot of 15-Inch RCP storm sewer, 95 foot of 12-Inch RCP storm Sewer, and drainage structures along E. Chestnut Ave, S. 34th St. & E. Leafdale Ave. The restoration includes the replacement of approximately 260 foot of CMP culverts, patching of driveways and roads, restoration of ditches, and seeding and mulching.
00 9100 ADDENDA
(click to expand/collapse)
Name | Size | |||
2024-30 - ADDENDA 1 FINAL | 390.2 KB |