Vulcan Watermine Pipeline [CP#2022-22]

The proposed project herein specified and described includes the following work: The project consists of installing a 14-inch HDPE raw water line that connects an existing 12” Cast Iron Pipe (CIP) near the Vulcan Pit to an existing 24” CIP water line near the raw water pumping station. Work will require Horizontal Directional Drilling (HDD) under the Sangamon River. Work will also include installation of instrumentation for pump operation and flow monitoring.