Kaskaskia College - Gymnasium Addition
Construct new 29,000 square foot slab on grade addition consisting of new gymnasium, restrooms, locker rooms, support spaces, and interior renovations. New addition to be constructed with structural precast, masonry veneer, metal wall panels, membrane roofing, and aluminum storefronts. Interior construction to consist of masonry, metal stud framing, drywall, acoustical ceilings, wood gym flooring, bleachers and resilient flooring. Project also includes renovation of existing spaces in the Fitness Center.
Status
Bidding Closed
Prebid Date7/23/24 2:00pm
Bid Date8/8/24 2:00pm
Company & Contacts
Poettker Construction
Justin Luitjohan
(618) 526- 3395
Location
27210 College Road, Centralia, IL 62801
Bid Documents can be purchased for a fee of $355 per printed set (plus shipping, where applicable), or $75 for a digital-only copy. Purchases are non-refundable.
A Pre-bid Meeting will be held on July 23, 2024, at 2:00 PM, prevailing time, at the Alumni & Friends Conference Room A142H (Southeast Corner of the Cafeteria/Student Center) at 27210 College Road, Centralia, IL 62801. This meeting is not mandatory, but it is strongly recommended that all interested bidders visit the site prior to bidding.